Bugoigo — Walukuba Water Supply System

Uganda · Lake Albert shore · 2020 · AfDB — African Development Bank
Flow rate
2 × 125 m³/h
Source
Lake Albert
Location
275 km NW of Kampala
Funder
AfDB

A large rural project in a poorly equipped region. The intake is taken directly from a river fed by Lake Albert — surface water with the quality constraints that come with it. The process was adapted to the local resource.

Specifications

  • IntakeRiver — 2 × 125 m³/h
  • DestinationDrinking water supply
  • ProcessAdapted to Lake Albert

Treatment process

  • 01 — CoagulationAl₂(SO₄)₃
  • 02 — FlocculationFCP4
  • 03 — FiltrationSand filtration
  • 04 — DisinfectionChlorination
  • 05 — BoosterBooster station

Highlights

Simple operation for local teams, process reliability on lake water, booster station sized to feed the rural distribution network.

Bugoigo — KSB pumps in workshop
← Dakar All projects →
A similar project

A plant
in a rural area?

Tell us your context. A project lead comes back within 48h.

Talk about a project