A private project on a different scale from large funder-backed sites: 96 m³/day, one building, offices. But with strong material requirements (316L stainless throughout) and the need to deliver turnkey — design, supply, integration.
Design and supply of the drinking water plant and the firefighting pumping system. A single technical contact for a project with two components.
Coastal industrial zone, slightly saline atmosphere, chlorine disinfection. 304L stainless would have lasted a few years. 316L lasts decades. Acceptable extra cost on a small installation, huge benefit over service life.



Tell us your context. A project lead comes back within 48h.
Talk about a project